The plunger mud pump is used for ceramic mud high-pressure spray drying and pulverizing. The model of the spray drying tower is 10000, and the output is 30 tons of dry powder/hour. The spray pressure is 12 kg.


41c6b3d9a9528f31ca74db820ea729b.png


Pump usage:

The factory originally used three YB300-40 pumps, with two working simultaneously and one as backup. The YB300 plunger mud pump has parameters such as a flow rate of 40 cubic meters per hour, a high pressure of 20 kilograms, a working pressure of 12 kilograms, and a motor power of 30 kilowatts. Since the spray drying tower is large and has a large output, one YB300 plunger mud pump cannot meet the output demand, so the output can be met by using two sets of simultaneous operation. After half a year of operation, it was found that vulnerable parts were replaced frequently. The plunger seal is replaced once a month, the valve disc is replaced once every 15 days, the oil pump is replaced once every 6 months, and the valve core and seat are replaced once every two months. The heavy maintenance workload has a significant impact on normal production. After inspection and analysis by our technical personnel, it was found that the ceramic plunger diameter of the plunger mud pump is too small and the operating frequency is too fast. The plunger reciprocates 35 times per minute to reach the operating limit, and the valve core opens and closes frequently. The pressure is high, and the oil temperature is too high at 65 degrees Celsius. So it leads to frequent replacement of vulnerable parts. Suggest replacing with YB400-80.

Usage of YB400 plunger mud pump after replacement. YB400 parameters, flow rate of 80 cubic meters per hour, high pressure of 18 kilograms, operating pressure of 12 kilograms, motor power of 45 kilowatts. After replacing the pump, the plunger sprinted 21 times, reducing the number of thrusts by 14 times. The sealing ring replacement cycle is every 8 months. The valve core is a newly patented product, with a valve disc replacement cycle of 4 months and a valve core and seat service life of over 2 years.


0f78ae64f6956e2e211db79215c0434.png


Comprehensive evaluation

After replacing the YB400 plunger mud pump, the frequency of replacing vulnerable parts has been greatly reduced, and the number of shutdowns and repairs has been reduced. At the same time, it saves the manufacturer more than 20000 yuan in material costs annually, and the power has been reduced by 15 kilowatts. The energy-saving effect is significant.


dc7937dfaf0c21473b26cbcb1e78d80.png

相关内容

Leather sludg...
  The energy-saving transformatio...
2025-09-08 08:24:54
Xianyang plun...
  Xianyang plunger pumps have a h...
2025-09-05 10:18:24
Manufacturer ...
  Xianyang Huaxing Pump Industry ...
2025-09-05 10:09:06
Energy saving...
  The energy-saving transformatio...
2025-09-03 09:00:08
Model and par...
  The model and parameter design ...
2025-09-03 08:54:10
Sludge plunge...
  The YBH300-40-15KW sludge plung...
2025-09-03 08:48:29

热门资讯

Sand washing wa... This project involves the use of wastewater from a...
Daily ceramic h... DetailsThis project involves various mineral raw m...
Plunger mud pum... DetailsThe plunger mud pump is used for ceramic mu...
Replace hose pu... DetailsThis project is applied to solid-liquid sep...
sewage-treatmen... DetailsThis project is for municipal sludge treatm...
Printing and dy... DetailsMaterial characteristics: After passing thr...
Pile driving se... DetailsThis project is used for pile driving sewag...
sewage-treatmen... DetailsThe biological Liqin process is used to tre...
Jianghan Petrol... DetailsThis project is the harmless treatment of o...
CNNC Guyuan Ura... DetailsMaterial characteristics: After passing thr...